The construction of the parlor is moving along very quickly. The building crew started work for the first time on Monday, May 6, and worked that Monday, Tuesday and Wednesday. Thursday was an Amish holiday they observed, so no work on Thursday. They returned Friday, and again Monday, May 13. Almost all of the outside of the parlor is complete, with the exception of a small part of the back roof where the loafing barn will join up to it. This is the building the cows will loaf in. :0 and make us milk!(we hope anyway) There is also a small piece of tin on the front of the parlor that is not put on, waiting for the garage door installer to put up the overhead doors. I ordered the plastic sheeting that will be put in the parlor and milk room last week, it was suppose to arrive at the farm on Friday, May 10th. However, due to a haz-mat spill on the truck, it was delayed in Illinois and couldn't arrive until Monday. The crew put up the lathes that the plastic is attached to and started installing the plastic on Monday, May 13th. (I should note that Monday, May 13th was a very chilly day!) They also put up a wall in the rafters to try and keep birds out of nesting over top of the parlor. We've enjoyed getting to see Levi, Sam and Melvin(Amish brothers) and John bringing our dreams to reality!

 |
| Adding header for overhead door |
 |
| Working on header for other side |
 |
| Putting up lathe for the plastic sheeting |
 |
| Thought I'd take a picture of the rafters before they are covered |
 |
| Finishing tin on front of parlor |
 |
| Putting up wall for bird barrier |
 |
| Truck the plastic came in |
 |
| Pile of plastic |
 |
| First row of plastic put up |
 |
| Sheeting wall finished |
 |
| Working on second row of plastic |
 |
| At end of day on Monday, May 13 half of parlor with plastic up and lights installed! |
 |
| Overall picture of almost finished parlor, thanks Levi, Sam, Melvin and John for your hard work! |