| The road crew is widening our road getting ready for chip n seal. The excess soil is being dumped on a huge stack of trees to strengthen the pad that was built for our construction site. |
| Found this cool picture of Levi installing the cat walk in the parlor. |
| Future Farmers of Our Dairy! Noah-5, Hannah-13 3/4, Zach-12, and Josh-8 |
| So the winner of the special job called get in the water filled ditch and dig out the plastic drain tile so the water will drain = ME! (Dora) |
| Even with a smile! or maybe a grimace, not sure. |
| But this is a smile, showing Hannah how fun it is to play in the mud! |
| Getting instructions from the boss, Dad. |
| See, here's the laughing part I mentioned earlier. |
| And here's me, finally free. |
| One of the test holes dug, it passed inspection! On with the wet land cells. |
| Shawn getting the hang of the controls for the lift, me not so sure I'm ready for this! |
| Hang on!!! |
| Ground crew, includes Angie and Zach. |
| Shawn and Dora installing J channel for plastic with Josh's help. |
| Dad trying out the lift. |
| Measuring distance to center of ceiling, trying to get the most use of the plastic. |
| Watching Shawn cut the plastic. |
| Just about to the end of this wall. |
| Time to pose now, almost finished! |
| Dad making sure all's just right. |
| Bottom half of plastic complete in only 2 hours! Ceiling took 6 hours. |